A heat pump outdoor unit mounted on a concrete pad next to the gray-sided exterior wall of a residential house.

Heat Pump Installation in Farmerville, LA

Tell us about the job

Takes about a minute. No obligation.

New system or replacementHeat PumpUnion Parish, LA
Step 1 of 2

What ZIP code is the job in?

Farmerville runs its AC most of the year

Union Parish is zone 3A, with a long stretch of cooling and only a short mild winter. Any split-system heat pump installed here has to hit at least 14.3 SEER2 for cooling and 7.5 HSPF2 for heating.

That floor sets what you're choosing from

A heat pump has to clear that minimum before it's sold for installation here. So every model you compare has already cleared the bar, and the real choice is how far above it you want to pay to go.

5 months
November through March, your system heats
5 months
May through September, it cools
37°F
the average winter night it heats against
92°F
the average summer afternoon it cools against
Isometric line illustration of a cutaway house showing interior rooms with furniture, ceiling ductwork connected to an indoor air handler, and an outdoor condenser unit linked by refrigerant lines.
Your system heats November through March and cools May through September.

NOAA nClimDiv, 1991–2020 normals

Half the homes in Union Parish were built in 1987 or earlier.

A heat pump sized to the house handles either an older place or a newer one.

Most of Union Parish already heats with electricity

64.5% of homes heat with electricity
112 damaging wind events from 2015 to 2024
Power costs 11.73 cents a kWh statewide
Built for wind, not just heatUnion Parish saw damaging wind 112 times from 2015 to 2024

Electricity here runs 11.73 cents a kilowatt-hour, below the national average. That changes the math on a heat pump upgrade. A higher-SEER2 model still uses less power than a low-efficiency one, but with power this cheap, the extra cost of the top-tier unit takes longer to earn back. It's worth asking a contractor to walk through that payback time before paying up for the highest rating on the shelf. Where the money matters more is the heat pump itself holding up through a long outage and a hot summer, not shaving another cent off the power bill.

Get it in before October, on your schedule

Heat here runs November through March, with October the month before it starts. Installing before October means the system is tested and running before the first cold night, not during one.

Find a contractor
A residential heat pump outdoor unit mounted on a concrete pad next to a house with gray vinyl siding.

What happens on install day

The old equipment comes out first. Lines get cut, refrigerant gets recovered into a tank, and the condenser and any old furnace or air handler get hauled off before anything new goes in. Once the pad is clear, the new outdoor unit gets set and leveled. The indoor coil or air handler goes in wherever the old one sat, assuming it still fits the new system. Running new line set takes longer than reusing the old, and most jobs call for new line set anyway. The electrical hookup is its own step. The disconnect gets mounted or swapped, and the breaker gets checked against what the new unit draws. After everything is connected, the system gets charged with refrigerant and run through a startup check. A tech checks airflow, checks pressures, checks the temperature split at the vents, and makes sure the thermostat is talking to the unit the way it should. Walking the ductwork for obvious leaks is part of that check too, not just the equipment itself. None of this is quick. A full changeover usually eats most of a day, sometimes longer if the ductwork needs work beyond swapping the unit.

Ask what happens below freezing

Every heat pump loses capacity as the outside air gets colder, and most lean on backup heat strips to make up the difference. Ask at what temperature the compressor stops carrying the load alone and the backup kicks in, and what that backup is. A unit that switches over too early will run up the power bill on the coldest nights.

Ask how the ductwork was checked, not just the unit

A heat pump moves more air across more hours than a furnace does, so leaks or a too-small return will show up faster. Before comparing one model against another, ask whether the existing ducts were tested for leakage and sized for the new system, or whether the quote assumes they're fine as they are.

Whatever is coming out gets disconnected and hauled away, and that includes the refrigerant inside it. By law that refrigerant has to be recovered into a tank before the old unit is cut loose, not vented off. A licensed contractor carries the equipment to do that as part of the removal, not as an extra step. If the old system was a furnace paired with a separate AC, both the furnace and the condenser come out, along with the line set running between the indoor coil and the outdoor unit. Old line set is usually replaced rather than reused, since it was sized and cleaned for the old refrigerant, not necessarily what the new heat pump runs on. The pad the old condenser sat on can often stay if it's level and big enough for the new unit.

A few things push the price more than the equipment tag does. Sizing is one of the biggest. Getting it right means a load calculation on the house, not just matching whatever was there before, and that takes real time on site. Ductwork is another. If the existing ducts need to be resized, sealed or extended to handle what the new system moves, that work can cost more than the heat pump itself. Where the line set has to run, how far the outdoor unit sits from the indoor coil, and whether the electrical panel can take the new load all factor in too. A disconnect that needs upgrading or a breaker that needs replacing adds work before the heat pump ever gets set on its pad. None of this shows up on the spec sheet, but it's most of what separates one quote from another.